Container Vessel BWMP
As per the requirements of owner, our company is responsible for the preparation of three (3) container vessels ballast water management plan.
The aims to make the ballast water and sediment control and management to meet the ballast water management and ballast water management plan guide (MPEC. 127 (53)) requirements, and provide the standard of ballast water exchange and deposit processing operations and you need to follow the guidance of safe operating procedures.
- Pre:27,000DWT MPP 2018/5/21
- Next:Company Note 2013/11/13