Mooring Equipment
When Safe Working Load (S.W.L) of towing fittings is modified in order to meet Port Hedland requirement of Australia, the local supporting structure underneath the relating towing fittings (chock, bollard) shall be reinforced according to strength calculation with the design load (1.25×S.W.L).
DJ marine is responsible for mooring arrangement, reinforcement, and strength calculation of fitting .
- Pre:Floating Box 2019/10/10
- Next:Company Note 2013/11/13