10K GC Delivery
From signed design contract on May 2017, with supports from shipyard, owner, RINA and DJ marine, two 10,200DWT general cargo vessels (M. V. “CAPE VERGA PEARL I & II”) have delivery successfully on June 2018.
These two vessels are cooperation between Concordia-Damen and DJ MARINE, build for SMT in Europe, for ore carrier in Africa.
The design point and particular of these vessels are mainly as follows:
1) Container propulsion on aft end;
2) Only one cargo hold;
3) No ballast tank for whole vessel;
4) Since 20nm coastal navigation, in order to low cost, Ruler and equipment exemption.
- Pre:60K BC Domestic 2018/7/11
- Next:Company Note 2013/11/13