Stability Check for Deck Cargo
During bridge building in Ocean area, stanchion and bridge box are to be carried by deck cargo carrier or deck cargo barge.
In order to ensure safety, as per owner’s requirements, DJ Marine is responsible for stability verification for twelve (12) vessels.
- Pre:32.75M Costal Ferry 2018/3/15
- Next:Company Note 2013/11/13