49K BC BWMP
As per the requirements of Owner, our company is responsible for the preparation of six BC ballast water management plan
The aims to make the ballast water and sediment control and management to meet the ballast water management and ballast water management plan guide (MPEC. 127 (53)) requirements, and provide the standard of ballast water exchange and deposit processing operations and you need to follow the guidance of safe operating procedures.
- Pre:411TEU BWMP 2017/7/20
- Next:Company Note 2013/11/13