As per the requirements of Owner, our company is responsible for the preparation of a LPG vessel of ballast water management plan.
The aims to make the ballast water and sediment control and management to meet the ballast water management and ballast water management plan guide (MPEC. 127 (53)) requirements, and provide the standard of ballast water exchange and deposit processing operations and you need to follow the guidance of safe operating procedures.